Site Selection Committee Meeting — June 15, 2026

Lebanon WWTP Site Selection — Public Record Archive  |  Return to main page

Video recording (YouTube)  —  Meeting began 4:00 p.m., City of Lebanon Administration Building

Attendance

Chair Jeff Baines presided. Committee members present: Jody Vance, Tom Clemmons, Steve Jones (engineer, non-voting), Phil Morehead, Joey Carmack, Camille Burdine, Caleb Thorne, Dave Dixon, Randy Lane, Regina Santana. Minutes from June 2 were reviewed and approved after brief clarifications on the conceptual plant layout maps.

New Sites Added

Site 21 — Back portion of Wilson County Landfill (timestamp 30:36): Steve Jones identified and emailed this site to committee members prior to the meeting. Approximately 66.48 acres on the unused/reserved back section of the county landfill property. No flood plain issues identified. However: approximately 27,000 linear feet of force main would be required; no three-phase power, water, or gas available; the landfill access road is locked at night and a separate road would need to be built; and the property is county-owned, requiring a city-county agreement for acquisition. Environmental site assessment would also be required. Jeff Baines noted the site is a legitimate permitted land use adjacent to the landfill. The committee voted to add Site 21 to the matrix.

Site 7A — Access parcel for Site 7 (timestamp 34:07): A ~24-acre parcel south of Site 6, held in trust in Virginia, was identified as a necessary access property for Site 7. Without it, the only access route would be through an impractical road. Jeff Baines stated: “I won’t believe site seven is worth much without that site.” The committee agreed to evaluate 7A as part of Site 7 going forward.

Site 13 / 13A consolidated (timestamp 1:13:55): Not a new site but a significant matrix reorganization. The committee agreed that Site 13 (Rockwood site) and Site 13A (the adjacent ~44-acre Cedar Farms / Map 45 Parcel 57 parcel, owned by an out-of-state New York entity in bankruptcy proceedings) should be evaluated as a single combined entry. A further ~8-acre Alley Cassidy corner parcel was also identified as part of the combined picture. Total assembled acreage discussed: approximately 120–150 acres. Jeff Baines noted he had asked the city attorney to identify and contact the New York owners. Derek Dodson (public commenter) provided contact information for those owners.

Scoring Matrix — Submission Deadline

The committee finalized the process for individual member scoring. Each member was to complete their matrix independently and return sealed sheets to the city administrative offices (200 Carver Lane) by Wednesday, June 24. Scoring would be anonymous — names not attached to individual rankings. The accounting department would tabulate the scores. An updated Excel version of the matrix (incorporating Site 21 and the revised Site 13 configuration) was to be distributed to members by June 16.

Jeff Baines emphasized: “This matrix is not the tool. It’s not absolute. It’ll give us a guideline.” The goal was to reduce from approximately 21 sites to 8–10 at the June 29 meeting.

Engineer Updates on Key Sites

Committee Member Positions (Informally Expressed)

No formal scores were announced. However, several members expressed directional preferences:

A public commenter (Kenny Salis) explicitly thanked “the three of you who are on our side so much” — suggesting at least three committee members had visibly expressed a preference for city-adjacent sites.

Formal Votes and Actions

Public Comment Highlights

Next Steps

These notes were prepared by Todd Roark from the YouTube auto-generated transcript of the June 15, 2026 meeting and represent a summary, not a verbatim record. The official minutes, once approved by the committee, are the authoritative record.